跳到主要内容

Job pricing and customer installation

This page is the fabrication price a print shop quotes to a customer. Whether you may sell and deliver a sign made with the software is in Plans and license.

Do not call a price from an hourly feeling. Add material, machine time, finishing labor, electrical parts, and a failure rate, then divide by the target margin. The amounts below are practice starting rates. Replace them every month with the latest purchase receipts and local labor.

Print time and settings that cut failures are in High-speed profiles. Extra assembly time from a split is added from Split rules.

The price formula​

SymbolItemCalculation
MMaterialGrams used × (spool cost ÷ 1000)
MfMaterial with failuresM × (1 + failure rate)
HMachinePrint hours × machine rate per hour
LLabor(finishing + wiring + packing) hours × labor rate per hour
EElectricityAverage kW × hours × price per kWh
PBought-in partsLED, power supply, wire, diffuser, and screws at cost
CCostMf + H + L + E + P
QQuoteC ÷ (1 − target margin rate)

A target margin of 0.35 is not "add 35% to cost". It is the rate that makes cost 65% of the selling price, which means divide cost by 0.65.

How you name itFormulaCost 50,000 KRW, rate 0.35
MarkupCost × (1 + 0.35)67,500 KRW (about 26% gross margin on sales)
Target marginCost ÷ (1 − 0.35)76,923 KRW (35% gross margin on sales)

Write which formula the quote uses. If each person uses a different one, the same job gets two prices.

Starting rate card​

These are 2026 practice rates for a small shop in Korea. Do not freeze them in the quote spreadsheet. Replace them with the latest invoices.

ItemStarting rateIncludedNot included
PLA20,000–30,000 KRW/kgOrdinary solid colorsSilk and glow surcharge
PETG25,000–35,000 KRW/kgGeneral purposeFlame-rated material
ASA35,000–50,000 KRW/kgGeneral outdoorPaint after printing
Machine time3,000–6,000 KRW/hDepreciation, nozzles, bed wearNight surcharge
Labor15,000–25,000 KRW/hSupports, fitting, soldering, packingOn-site travel
Electricity150–250 KRW/hAssumes a printer averaging 80–150 WHeating, compressor
Failure rate8–15% by weightCoupons, first-layer failures, scrapRedesign reprints
Design changesSeparate labor hoursOne tolerance adjustmentA new logo, or changed copy

Electricity is not a main line of the quote. Leaving it out barely moves the total. Leaving out machine time or labor collapses the quote.

Do not bury bought-in parts inside the print price. Give them their own rows.

PartHow to quote it
LED stripMeters used × purchase price × 1.15 (offcuts)
Power supplyCost of a unit at 1.25 times the calculated watts
Wire, connectors, heat-shrinkA flat amount per letter, or actual cost
Diffuser and acrylicCut-shop cost, plus one spare sheet for breakage
Screws and anchorsCan be excluded if the customer installs

A worked quote​

Conditions: 280 g PLA, 7.5 hours of printing, 1.2 hours of finishing and wiring, 2.0 m of 5050 strip, one 12 V supply. Practice rates: PLA at 25 KRW/g, machine at 4,000 KRW/h, labor at 20,000 KRW/h, electricity at 200 KRW/h, 10% failure, LED and supply at 22,000 KRW cost, target margin 35%.

ItemCalculationAmount
Mf280 × 25 × 1.107,700 KRW
H7.5 × 4,00030,000 KRW
L1.2 × 20,00024,000 KRW
E7.5 × 2001,500 KRW
PLED plus supply, at cost22,000 KRW
CSum85,200 KRW
Q85,200 ÷ 0.65131,077 KRW, quote 132,000 KRW

If the design changes and you print again, bill a rework row, not the failure rate. A customer copy change and a failed print do not share a cell.

Lead time is slicer time multiplied by a finishing factor of 1.3–1.8. If the bed is already on another job, state the wait separately. Add dry-fit time for split parts to labor in 0.3–0.5 hour steps.

Customer installation guide​

These are the handoff conditions to attach to the delivery note. New 220 V sign circuits and in-wall electrical work stay with a qualified electrician who has checked the site. The delivery scope in this wiki stops at the fabricated body and the specified DC supply.

ItemWhat you hand overWhat the customer prepares
Power12 V or 24 V DC, as marked on the bodyA supply at or above the quoted watts, or the supply you included
Polarity+/− or a keyed connectorKeep polarity if they extend the cable
SiteIndoor or outdoor, as written on the quoteFor outdoor work, write the ingress rating and whether there is a canopy into the contract
MountingRear holes or a bracket drawingAnchors matched to the wall. Do not screw straight into drywall
Feed lengthLengths that need power at both ends are marked on the drawingKeep the same wire gauge on any extension
TestA 30-minute light-up record before it leavesLight it again for 10 minutes after installation
ExcludedWall level, bringing in a sign circuit, night work at heightA separate installation contract

If the quote says outdoor, write the material (PETG, ASA, or similar) and the weatherproofing method in the materials line. Do not take an outdoor job at an indoor PLA rate.

Outgoing inspection​

StepCriterionFail
1Outline within ±1.0 mm per meter of the drawing, joint step 0.3 mm or lessThe joint throws a shadow from the front
2The specified profile and material lot are recordedAn unrecorded overnight print
3Lit in a dark room with the diffuser closedYellow ends, dark sections, or hot spots
4Supply label voltage equals strip voltage12 V and 24 V mixed
5No polarity exposed on metalA short to the case
6The supply case is not overheating after 10 minutesUndersized supply

Write print time, grams used, and actual labor hours on the inspection sheet. The next quote's H and L then come from the shop's own data, not from the sample rates.