Job pricing and customer installation
This page is the fabrication price a print shop quotes to a customer. Whether you may sell and deliver a sign made with the software is in Plans and license.
Do not call a price from an hourly feeling. Add material, machine time, finishing labor, electrical parts, and a failure rate, then divide by the target margin. The amounts below are practice starting rates. Replace them every month with the latest purchase receipts and local labor.
Print time and settings that cut failures are in High-speed profiles. Extra assembly time from a split is added from Split rules.
The price formula
| Symbol | Item | Calculation |
|---|---|---|
| M | Material | Grams used × (spool cost ÷ 1000) |
| Mf | Material with failures | M × (1 + failure rate) |
| H | Machine | Print hours × machine rate per hour |
| L | Labor | (finishing + wiring + packing) hours × labor rate per hour |
| E | Electricity | Average kW × hours × price per kWh |
| P | Bought-in parts | LED, power supply, wire, diffuser, and screws at cost |
| C | Cost | Mf + H + L + E + P |
| Q | Quote | C ÷ (1 − target margin rate) |
A target margin of 0.35 is not "add 35% to cost". It is the rate that makes cost 65% of the selling price, which means divide cost by 0.65.
| How you name it | Formula | Cost 50,000 KRW, rate 0.35 |
|---|---|---|
| Markup | Cost × (1 + 0.35) | 67,500 KRW (about 26% gross margin on sales) |
| Target margin | Cost ÷ (1 − 0.35) | 76,923 KRW (35% gross margin on sales) |
Write which formula the quote uses. If each person uses a different one, the same job gets two prices.
Starting rate card
These are 2026 practice rates for a small shop in Korea. Do not freeze them in the quote spreadsheet. Replace them with the latest invoices.
| Item | Starting rate | Included | Not included |
|---|---|---|---|
| PLA | 20,000–30,000 KRW/kg | Ordinary solid colors | Silk and glow surcharge |
| PETG | 25,000–35,000 KRW/kg | General purpose | Flame-rated material |
| ASA | 35,000–50,000 KRW/kg | General outdoor | Paint after printing |
| Machine time | 3,000–6,000 KRW/h | Depreciation, nozzles, bed wear | Night surcharge |
| Labor | 15,000–25,000 KRW/h | Supports, fitting, soldering, packing | On-site travel |
| Electricity | 150–250 KRW/h | Assumes a printer averaging 80–150 W | Heating, compressor |
| Failure rate | 8–15% by weight | Coupons, first-layer failures, scrap | Redesign reprints |
| Design changes | Separate labor hours | One tolerance adjustment | A new logo, or changed copy |
Electricity is not a main line of the quote. Leaving it out barely moves the total. Leaving out machine time or labor collapses the quote.
Do not bury bought-in parts inside the print price. Give them their own rows.
| Part | How to quote it |
|---|---|
| LED strip | Meters used × purchase price × 1.15 (offcuts) |
| Power supply | Cost of a unit at 1.25 times the calculated watts |
| Wire, connectors, heat-shrink | A flat amount per letter, or actual cost |
| Diffuser and acrylic | Cut-shop cost, plus one spare sheet for breakage |
| Screws and anchors | Can be excluded if the customer installs |
A worked quote
Conditions: 280 g PLA, 7.5 hours of printing, 1.2 hours of finishing and wiring, 2.0 m of 5050 strip, one 12 V supply. Practice rates: PLA at 25 KRW/g, machine at 4,000 KRW/h, labor at 20,000 KRW/h, electricity at 200 KRW/h, 10% failure, LED and supply at 22,000 KRW cost, target margin 35%.
| Item | Calculation | Amount |
|---|---|---|
| Mf | 280 × 25 × 1.10 | 7,700 KRW |
| H | 7.5 × 4,000 | 30,000 KRW |
| L | 1.2 × 20,000 | 24,000 KRW |
| E | 7.5 × 200 | 1,500 KRW |
| P | LED plus supply, at cost | 22,000 KRW |
| C | Sum | 85,200 KRW |
| Q | 85,200 ÷ 0.65 | 131,077 KRW, quote 132,000 KRW |
If the design changes and you print again, bill a rework row, not the failure rate. A customer copy change and a failed print do not share a cell.
Lead time is slicer time multiplied by a finishing factor of 1.3–1.8. If the bed is already on another job, state the wait separately. Add dry-fit time for split parts to labor in 0.3–0.5 hour steps.
Customer installation guide
These are the handoff conditions to attach to the delivery note. New 220 V sign circuits and in-wall electrical work stay with a qualified electrician who has checked the site. The delivery scope in this wiki stops at the fabricated body and the specified DC supply.
| Item | What you hand over | What the customer prepares |
|---|---|---|
| Power | 12 V or 24 V DC, as marked on the body | A supply at or above the quoted watts, or the supply you included |
| Polarity | +/− or a keyed connector | Keep polarity if they extend the cable |
| Site | Indoor or outdoor, as written on the quote | For outdoor work, write the ingress rating and whether there is a canopy into the contract |
| Mounting | Rear holes or a bracket drawing | Anchors matched to the wall. Do not screw straight into drywall |
| Feed length | Lengths that need power at both ends are marked on the drawing | Keep the same wire gauge on any extension |
| Test | A 30-minute light-up record before it leaves | Light it again for 10 minutes after installation |
| Excluded | Wall level, bringing in a sign circuit, night work at height | A separate installation contract |
If the quote says outdoor, write the material (PETG, ASA, or similar) and the weatherproofing method in the materials line. Do not take an outdoor job at an indoor PLA rate.
Outgoing inspection
| Step | Criterion | Fail |
|---|---|---|
| 1 | Outline within ±1.0 mm per meter of the drawing, joint step 0.3 mm or less | The joint throws a shadow from the front |
| 2 | The specified profile and material lot are recorded | An unrecorded overnight print |
| 3 | Lit in a dark room with the diffuser closed | Yellow ends, dark sections, or hot spots |
| 4 | Supply label voltage equals strip voltage | 12 V and 24 V mixed |
| 5 | No polarity exposed on metal | A short to the case |
| 6 | The supply case is not overheating after 10 minutes | Undersized supply |
Write print time, grams used, and actual labor hours on the inspection sheet. The next quote's H and L then come from the shop's own data, not from the sample rates.